Loading...
Loading...
Contributors:
Dataset URI:
10.6084/m9.figshare.33046883.v1This file contains the supplementary materials for the study entitled "Perceived cost constraints as an independent dimension: An extended TOE-E framework for human-robot collaboration in construction." It includes the full survey questionnaire (Appendix A), respondent demographic cross-tabulation statistics (Appendix B), and complete SPSS output tables for common method bias diagnosis (Appendix C), reliability and validity tests (Appendix D), and mediation and moderation analyses (Appendix E). All materials are provided to support the reproducibility and transparency of the reported findings.
Keyword(s):
Construction engineering; Construction Project Management; cost constraints; Human-Robot Collaboration (HRC); survey research method.
MeSH Term(s):
Grants and Funding:
Associated Publication(s):
No Associated Publication Data Available
Supplementary Data:
No Supplementary Data Available
Related Dataset(s):
No Related Dataset Data Available
The National Library of Medicine (NLM) provides information about biomedical datasets. Inclusion on an NLM Web page does not imply endorsement of, or agreement with, the contents by NLM or the National Institutes of Health. Learn more: NLM Web Policies (nih.gov)