Loading...
Loading...
Dataset URI:
10.1371/journal.pone.0349981.t006Day-ahead operation of regional natural gas transmission networks requires station demand forecasts and their translation into inventory-preparation references. This study evaluated a sequential forecast-to-dispatch workflow for the Chongqing regional gas network. Six forecasting models were assessed under a leakage-controlled 30-day walk-forward protocol. Across nine routine stations, mean station-level MAPE was 8.61% for SARIMAX, 8.95% for XGBoost, and 9.78% for GRU. The corresponding values were 10.93% for LSTM, 11.63% for BPNN, and 11.77% for CNN-BiLSTM-Attention. Station G was assessed separately as a data-quality boundary case; Station K was excluded because only 62 observations were available. An independent archived 18-day hourly dataset reported reconstruction MAPE of 6.7%−8.1% and peak-timing deviations of 1.0–1.5 h. A retrospective West-pipeline case for 22 April 2023 traced historical station forecasts through weighted aggregation, intermediate rounding, hourly reconstruction, and reduced-order linepack calculation. Its LFFX preparation target and the separate NGXDD and DLFX targets were 1.272, 4.702, and 1.571 × 10⁶ m³, respectively. All three targets passed case-specific deterministic inventory checks. The results support station-specific forecast-model selection and an explicit interface between daily prediction and segment-level inventory preparation.
Keyword(s):
0 &# 8211; 10 &# 8310; 5 h; 62 observations; 7 %&# 8722.
MeSH Term(s):
Grants and Funding:
No Grants or Funding Data Available
Associated Publication(s):
Supplementary Data:
No Supplementary Data Available
Related Dataset(s):
No Related Dataset Data Available
The National Library of Medicine (NLM) provides information about biomedical datasets. Inclusion on an NLM Web page does not imply endorsement of, or agreement with, the contents by NLM or the National Institutes of Health. Learn more: NLM Web Policies (nih.gov)