10.5281/zenodo.23229533Decorative finishing works in construction are characterized by high labor intensity, since a considerable part of the process consists of successive operations such as surface preparation, priming, formation of the base layer, application of the decorative composition, texture formation, and final finishing. In this article, the methodology for studying mechanized gypsum plastering by means of time-and-motion observations is retained in substance and adapted to decorative plastering works. A finished surface area of 100 m² was adopted as the unit of investigation, and labor input, work duration, and productivity were analyzed for individual operations. According to the actual calculation presented in a published technological chart for decorative facade plaster coatings, the total labor input is 77.4 man-hours per 100 m², while the work duration is 49.65 hours. Mechanization, flow-line organization of work, and the use of high-performance tools are assessed as the principal factors for reducing labor input and improving the stability of finishing quality.
Keyword(s):
decorative finishing, decorative plaster, mechanization, time-and-motion study, labor input, technological efficiency, technical-economic indicator, facade..
MeSH Term(s):
Grants and Funding:
No Grants or Funding Data Available
Associated Publication(s):
No Associated Publication Data Available
Supplementary Data:
No Supplementary Data Available
Related Dataset(s):
No Related Dataset Data Available
The National Library of Medicine (NLM) provides information about biomedical datasets. Inclusion on an NLM Web page does not imply endorsement of, or agreement with, the contents by NLM or the National Institutes of Health. Learn more: NLM Web Policies (nih.gov)