Loading...
Loading...
Contributors:
Dataset URI:
10.5281/zenodo.23323818The flexible job shop instance behnke29 (Behnke and Geiger 2012, 20 jobs, 40 machines, 100 operations) is listed as open in FJSPLib with lower bound 116 (credited to DOFP2026a) and upper bound 117 (credited to OptalCP), as of 12 October 2026. This deposit reports that the optimal makespan is 117.Version 2 adds a proof certificate for the lower bound that does not depend on the solver used in version 1. A SAT encoder in Python 3 (standard library only) writes the question "is there a schedule with makespan at most 116?" as a CNF formula with 193,872 variables and 464,313 clauses. CaDiCaL 3.0.1 reports it unsatisfiable and emits a DRAT proof, which drat-trim, lrat-check and the formally verified checker cake_lpr all accept. The deposit contains the encoder, the formula, the proof, the commands to check them and the output of our runs.The files of version 1 are kept unchanged in one archive: a schedule with makespan 117, a dependency-free checker, and a decision model in PyJobShop 0.0.9 for which OR-Tools CP-SAT 9.15.6755 answers INFEASIBLE at 116. The deposit lists the SHA-256 digest of every file. The instance itself is available from FJSPLib.Author affiliation: Team Banzai S.L.U.
Keyword(s):
behnke29; DRAT; FJSPLib; flexible job shop; makespan.
Grants and Funding:
No Grants or Funding Data Available
Associated Publication(s):
No Associated Publication Data Available
Supplementary Data:
No Supplementary Data Available
Related Dataset(s):
No Related Dataset Data Available
The National Library of Medicine (NLM) provides information about biomedical datasets. Inclusion on an NLM Web page does not imply endorsement of, or agreement with, the contents by NLM or the National Institutes of Health. Learn more: NLM Web Policies (nih.gov)